Sunday, 2 March 2014

All along the Leicester

It is noticeable along the GU to Leicester that there has been a lot of work put in recently. Much of the towpath has been levelled by dredging and back filling the trenches that have been appeared behind the piling. There has also been a lot of tree doctoring, but nowhere near enough. The long straight between bridges 46 & 47 is, in most places, so overgrown that two boats will find it difficult to pass.

DSCF0486

No comments: